Engineers who would rather fix a drawing than defend a workaround.
Founded in 2000, M&M Engineering and Safety Solutions has grown from a civil works contractor into a full delivery partner for infrastructure, industrial and building projects.

01 / Our story
From civil works to full delivery.
M&M started in 2000 as a civil works contractor taking on road, drainage and substructure packages for public authorities. The work was unglamorous and the margins were thin, which is a useful way to learn what a programme actually costs.
Clients kept asking us to handle more than the earthworks. First the supply, then the design coordination, then the safety paperwork and the final handover. Rather than refuse, we built the team to do it. That is where the safety engineering side of the business came from: the same people coordinating trades on site were the ones best placed to design the safe way to do the work.
Today we deliver as a principal contractor and as a specialist subcontractor, on projects that range from a single industrial shed to multi-year infrastructure programmes. The size of the job has changed. The discipline has not.
“The drawings already tell you most of what will go wrong. Our job is to read them first, not after.”

- Founded
- 2000
- Office
- Dhaka
02 / How we work
Principles you can see on site.
Six commitments that show up in how a job is planned, who turns up on it, and what is handed over at the end.
Start from the drawing
We read the construction documents before we price the job. Most problems on site were visible on paper first.
Name the risk early
A hazard raised during design costs a paragraph. The same hazard raised on site costs a stoppage.
Hold the programme
Weekly resourcing against the critical path. We report slippage when it appears, not at handover.
Build for the maintenance
Access panels, drainage falls and material choices that a facilities team can actually service.
Close the paperwork
As-built drawings, test certificates and O&M manuals handed over as a complete set, not as an afterthought.
Account for the whole cost
We value the maintenance cycle and the resale of the asset, not only the cost of the concrete and steel.
03 / How a project runs
From first visit to signed handover.
01
Site and document review
We walk the site, read the drawings and list the constraints that will drive the programme and the cost.
02
Method and programme
A construction method, a resource-loaded programme and a safety plan, agreed with you before work starts.
03
Procure and mobilise
Materials ordered and inspected, subcontractors appointed, site established and ready for the first pour.
04
Build and control
Work executed against the programme with weekly progress, cost and safety reporting.
05
Test and hand over
Commissioning, snagging, as-built documentation and operator handover, signed off and closed.

Weekly reporting, every week.
Progress against the critical path, cost to date, open snags and any risk that could move a date. It goes to the client whether or not the news is good.
02 / Speciality
Where we hold real depth.
General contracting is our baseline. These are the disciplines where our engineers carry the most site hours.
Site safety designed into the method, not bolted on after the incident.
- Task-based risk assessments and a site-specific HSE plan
- Permit-to-work systems for hot work, confined space and working at height
- Statutory audits against national labour and environment regulations
- Incident and near-miss investigation with corrective action tracking

Start a conversation
Tell us what you need built.
Send the drawings, the scope or just the problem. We will come back with what we can see in it.

Corporate office
Shonim Tower, 55 Shah Mokhdum Avenue, Sector 12Uttara, Dhaka 1230Bangladesh- Saturday to Thursday
- 09:00 – 18:00
- Friday
- Closed